Water Ballast Treatment System Installation

Marine Technical Solutions

The International Convention for the Control and Management of Ships’ Ballast Water and Sediments (BWM Convention), entered into force on 8th of September 2017,  requires ships to manage their ballast water to render harmless, remove or avoid the uptake or discharge of aquatic organisms and pathogens within ballast water and sediments.

As EPC company Marine Technical Solutions posses a strong background and can assist you to go throughout the entire process of ballast water management system installation, including:

In close cooperation with Alfa-Laval we integrate the latest generation of the leading ballast water treatment technology - PureBallast 3. Our main advantage is installation BWTS systems during the scheduled repairs and without the ship being out of service while staying in the port or on the voyage.

 

Please contact us to check how we can support you with integration of BWTS on your vessels: info@marin-ts.com.

Some of Recent Projects: